News

—26.06.2020
Coming soon: the interiors of Matreshka shopping center

The space of the shopping center has already get its special look

—17.06.2020
Baltia Mall- Work in progress

Baltia Mall, a shopping center with interiors made by Blank Architects, is under construction in Kaliningrad.

—15.06.2020
New vacancy

We are ready to start working on the new ambitious project and invite to join our team new employees

—09.06.2020
Lukasz Kaczmarczyk special for RBC Pro.

Lukasz Kaczmarczyk told about what apartments and houses people will need in future - special for RBC Pro.

—28.05.2020
Interview with Alexandra Razina, head of small creative projects at Blank Architects

The Department was created primarily because Blank Architects had sufficient experience and expertise to develop art projects.

—25.05.2020
Blank Architects made the unique lobby interior for "Metropolia 2"

Blank Architects made the unique lobby interior for each of the five towers of the residential complex Metropolia (stage 2) by developer MR Group.

—20.05.2020
Stolitsa shopping center is now open in Moscow

Stolitsa shopping center is now open in Moscow: the interiors of the local shopping complex were designed by Blank Architects.

—15.05.2020
Small Creative Design — meet the new department in Blank Architects

Blank Architects announces the new department of Small Creative Design with Alexandra Razina as Head.

—19.03.2020
Zarya shopping center on Bolshaya Semyonovskaya street in Moscow has opened

Zarya shopping center on Bolshaya Semyonovskaya street in Moscow has opened with interiors designed by Blank Architects.

—07.05.2020
5 trends that will change urban spaces after the pandemic

Magda Kmita, partner in Blank Architects, shared her forecast for future architectural changes specifically for Buro 24/7:

—24.04.2020
Our interior project on ArchDaily

Our interior project of Fabulously Answered Questions (FAQ) in Trend Island space in Moscow - on ArchDaily

—20.04.2020
Special for Vedomosti

How to create a shopping center that would be comfortable and safe even during the pandemic?

—14.04.2020
Tomorrow will come today

How an architect can create a new quality of housing for the citizen of the future

—02.04.2020
We are shortlisted!

Our project of the Russian pavilion for the Venice Biennale was included in the TOP 10 finalists of the competition organized by the pavilion.

—31.03.2020
Magda Cichon, Blank Architects — About New Working Conditions and distance work organization

The new working conditions require high flexibility in decision-making and flexibility for architects.

—24.03.2020
Moscow Architecture Prize 2020

Two projects of Blank Architects were nominated for the Moscow Architecture Prize 2020.

—17.03.2020
Nebo shopping center

Nebo shopping center in Moscow, Solntsevo, will be build to the Blank Architects project

dmitrovka_3d_1-4.jpg
Name
Location
Program
Status
Scale
Year
Dmitrovskoe 25 – Shopping and Wellness Center
Moscow, Russia
Program: Landscape, Retail, Mixed
Status: Ongoing
Scale: 10 000-50 000 sqm
Year: 2013

—07.11.2013
Dmitrovskoe 25 – Shopping and Wellness Center

The Center is located on Dmitrovskoye shosse - one of the main roads leading to the city center. The location and neighborhood were very important for us during the design process. The closest neighborhood includes a block from the Stalin period, a big hostel and a lot of small green areas. The main influence was the close proximity of a residential building.

We decided that the creation of a public green space between it and our Center, which could be used by local residents and the clients, was needed. In this area we suggested placing: a playground, a sport area, and a place to read as there is a public library and a book shop nearby.

The building’s area is 9000m2 and it consists of 3 floors.
On the first level we can find boutiques, a small supermarket and a restaurant. There is another restaurant and a fitness area on the second floor, where it will be possible to play basketball, volleyball, tennis, or to practice climbing on a climbing wall. On the 3rd floor there are a swimming pool and a spa center.

The façade is divided into three parts. The first part has a restaurant made from glass. We wanted to create a light pavilion that would be harmonized with the green areas outside. The second part is made out of brick, which was influenced by the materials used in the neighborhood. To underline the connection with the surrounding greenery and park.

Dmitrovskoye shosse, we designed a tree that is incorporated into the façade. The third part consists of a swimming pool located on the last floor and is made of glass. This allowed for the creation of a nice view from the pool, as well as for people from the outside to get a glimpse of the interior.