News

—10.02.2023
Rizhskaya metro station opened

Metro station Rizhskaya (Bolshaya Koltsevaya Line) was opened

—11.12.2022
Committee for Architecture and Urban Planning of Moscow approved the concept of a new club house Sminex-Inteko "Obydensky 1"

Committee for Architecture and Urban Planning of Moscow approved the concept of a new club house Sminex-Inteko "Obydensky 1"

—10.10.2022
Discovery Shopping Center becames the best mall on Arendator Awards 2022!

The project won a prestigious commercial real estate award.

—26.09.2022
Department stores

A department store in a shopping center is a whole world with the architecture based on its own canons.

—15.09.2022
Building of GEOLOG

Construction of the GEOLOG business center by Hutton Development is in progress on Obrucheva St. in Moscow.

—09.09.2022
The decoration of the "Rizhskaya" is 80% completed

Works on the architectural decoration of the Rizhskaya metro station in Moscow have been completed by 80%.

—20.07.2022
The St. Petersburg office of Blank Architects is working on HOLLYWOOD Shopping Center

This year St. Petersburg is waiting for one new shopping center - HOLLYWOOD, the architecture and interiors of which were created by Blank Architects team.

—19.07.2022
Shopping center "Vesna" renovation has been completed

The renovation of the shopping center "Vesna!" located on the Altufyevsky Highway has been completed according to our project: it includes the renovation of public spaces and food court.

—15.07.2022
New 4* hotel in Magadan in details

We found the architectural solution for the new 4* hotel project in Magadan in the harsh northern landscape – with its powerful rock breaks and stunning large-scale views.

—11.07.2022
Hotel in Agoy – new video about the project

The hotel complex in the Agoy Village of Tuapse district is one of our new, but already favorite projects.


Blank Architects strengthens the team

We invites chief, leading and landscape architects, and visualizer.

—27.06.2022
Discovery: grand opening

Discovery shopping center by developer MR Group has been opened in Moscow. The project became the first opened shopping center in the city since the beginning of 2022.

—14.06.2022
Blank Architects won at ArchMoscow

The Blank Architects team took part in the exhibition ArchMoscow 2022 — the main event of the architectural world, annually bringing together hundreds of professionals and experts.

—30.05.2022
Blank Architects at ArchMoscow

Blank Architects will present an exposition dedicated to the 20th anniversary of the bureau's at the exhibition "ArchMoscow 2022".

—23.05.2022
Blank Architects metro project was shortlisted

The project of the consortium BACE (Blank Architects and Clancy Engineering) for the Ostrov Mechty metro station became the finalist of the first stage of the International competition for the development of the architectural appearance of the Moscow Metro stations.

—12.05.2022
How the residential projects may look in future

How the residential projects may look in future and what are the architects ready to offer? The chief architect of Blank Architects projects, Dane Klyakovich, shared the opinion in the author's column for the Portal of Archsovet of Moscow on how the approach to the design of residential real estate will change.

—25.04.2022
Как новая турбулентность изменит торговые центры?

орговые центры в новых условиях закрытия международных брендов столкнулись с оттоком трафика, а эксперты предрекают рост вакансии.

—24.03.2022
New project in Sochi

Another hotel project by Blank Architects - this is a complex in the village of Maisky.

—17.02.2022
Rizhskaya station in progress

Look underground: at the station of BCL "Rizhskaya", which was designed be Blank Architects everything is already prepared for the installation of arched structures.

—15.02.2022
"Tomorrow will come today" is now available on our website

"Tomorrow will come today" is a research and manifesto dedicated to changes in the architecture of the housing in future and our ideas about how we see really comfortable modern homes.

—08.02.2022
Blank Architects made a masterplan concept for the Prokshino cluster in Moscow

Blank Architects has developed the concept of a masterplan for the Prokshino sports and event cluster in Prokshino, Moscow, - a unique project for Russia. The project includes cultural and sports facilities, an event venue, a water park and a 100 m high slide.

—03.02.2022
Branding for NOVAMALL

For an umbrella brand of shopping centers NOVAMALL, we have created a logo, corporate identity and brandbook.

—27.01.2022
Branding

We create real estate projects at all points of contact with the audience: from architecture and landscaping to interior design, way finding and unique branding.

—12.01.2022
The Discovery shopping center by MR Group has been commissioned

The Discovery shopping center by MR Group has been commissioned in Moscow as part of the residential complex. We have created the concept of interiors and navigation in for the shopping area: finishing works and installation of lighting are continuing inside.

tver-marina_-4.jpg
Name
Location
Program
Status
Scale
Tver — Marina and Residential Development
Tver
Program: Landscape, Masterplans, Mixed, Housing
Status: Completed
Scale: 200 000-500 000 sqm

—02.08.2012
Tver — Marina and Residential Development

The concept was done by Benoy.
The plot is made up of an extended rectangular shape and is located on the left bank of the Volga river, between Lenovo and Poddubye, in the Tver region connected, by a country road.

The total area is 48 ha and has the Volga river as its southern border, private land set aside for garden buildings on its western border, while the northern border is designated for recreation purposes. The slope of the relief is smooth with a height difference of about 3m throughout the entire width of the plot. There are small streams on the plot’s area which flow into the Volga river.
The plot is located in the 'third sanitary-protective zone' which pertains to underground water sources. This area has a number of restrictions on its use.

The Marina Village —
Planning Solution

GBA - 20 ha

residential areas
dry dock
yacht club
country club
marina hotel
multi-story apartments
free-standing equipment

The adopted planning solution provides for the placement of five villages to be built one after another. Each of the villages is connected to the other by recreational areas with streams flowing through them. In the villages, apartment blocks and three-story villas prevail, along with two to three story townhouses and multi-story residential buildings.

The apartments vary in the number of stories and have mixed-use first floors including two kindergartens of the thirty-five places that are built on the ground floors of the multi-story buildings. Part of the village is occupied by the construction of a dry dock for storage and the minor repairs of private yachts.

The residential areas of the villages have been connected by extensively landscaping the area for public use with open swimming pools, sports and recreation grounds. Parking for villa and townhouse owners are situated in their local areas. The marina village planning solution has the highest density of buildings and includes an artificial water area with mooring facilities for yachts (a yacht port), a yacht club, country club, marina hotel, multi-story apartments, free-standing equipment for both sport and recreation. The zoning of the village territory is shown in the layout of the master plan.